What Forestry Attachments Cost

This guide explains what moves the price of a forestry attachment in Australia, what a headline figure usually excludes, and how to compare two quotes on the only basis that matters.

  • 8 min read

Prepared by Forestry Machines Australia editorial teamSource-reviewed by Forestry Machines Australia source review

Published Last reviewed

Specifications can change. Confirm the current data sheet and quotation before ordering. How we research and review.

Multiple configured forestry attachments being compared in an Australian equipment yard
Editorial illustration: compare the delivered working package, not the bare attachment headline.

Anyone searching for the price of a forestry mulcher, tree shear or stump grinder wants a single number, and the honest answer is that no single number exists. We do not publish prices, and a figure invented for a web page would be worse than useless because it would be quoted back at a supplier who cannot honour it. What can be published is more useful: the things that actually move a quote, the things a headline figure quietly leaves out, and the method that turns two incomparable quotes into one comparable cost per unit of work.

Pricing rule

Never compare headline prices. Compare delivered, installed, working cost in the configuration you will actually run, then divide it by the work the attachment will do. Two quotes that look thousands apart on the front page routinely land close together once hoses, brackets, controls, freight and the first wear-part kit are added to both.

Why published list prices are rare in this category

Attachments in this market are not catalogue goods. A forestry mulcher or grapple saw is built to a configuration decided by the carrier it will hang from, the hitch on that carrier, the hydraulic circuits available, the tooling suited to the material and the delivery address. Two contractors ordering the same model number can receive genuinely different machines at genuinely different prices, and neither is being treated unfairly.

There are other reasons. Exchange rate movement affects imported attachments between order and delivery, freight varies with route and season, and options are not marginal here, since a rotator, a tilt or a second circuit can change both price and mass by a meaningful proportion. The practical consequence is that the first conversation with a supplier is not a haggle, it is a specification exercise, and the quality of the specification you provide determines the quality of the price you receive.

The cost drivers that move a quote most

To predict roughly where a quote will land before you receive it, look at these in order.

Carrier class is the biggest single driver, because it sets the attachment’s mass, and mass tracks price more closely than any brochure feature. A head for a large excavator is not a scaled photograph of a small one; it is more steel, larger bearings, a bigger motor and heavier tooling. Lift charts and attachment mass explains why buying up a class can cost you at the working radius rather than buying you capability.

Hydraulic configuration follows. The number of auxiliary circuits, whether a case drain is needed, and whether the head expects high flow at high pressure all affect the attachment build and the work needed on the carrier. That carrier-side work is a cost of the purchase even though it appears on a different invoice, and hydraulic matching sets out what to establish before ordering.

Then come the options, where quotes diverge most visibly. Continuous rotation, a tilt function, accumulators on a shear, a grapple or clamp arm, and the tooling choice on a mulcher are each real money. Tooling deserves particular attention because it is a price decision and an operating cost decision at once; blades versus carbide teeth sets out the trade-off, and the wrong choice for your material is expensive twice.

Bracket and hitch are most often left off an early quote. An attachment without a bracket matched to your coupler is not usable, and the bracket has a price, a mass and a lead time of its own. See quick couplers and attachment changeover.

Freight varies most by buyer. The same machine delivered to a metropolitan depot and to a remote site has two different landed costs, which is covered in buying across Australia.

What a headline price usually excludes

The figure a supplier says first is normally the attachment alone, ex the distributor’s premises. Everything below may be necessary and still sit outside it.

Ask whether each of these is in or out of the quoted figure

  • Hoses, fittings, couplings and any hard lines along the stick
  • Valve or diverter work on the carrier and the labour to fit it
  • Case drain provision where the attachment requires one
  • Electrical work, cab controls, switches or a joystick change
  • The mounting bracket or adaptor to suit your specific hitch
  • Installation, commissioning, pressure and flow setting, and an operator handover
  • A stand or cradle for safe storage and changeover
  • An initial wear-part kit so the machine does not stop in its first month
  • Freight to your site and any unloading requirement at the other end
  • GST, and whether any figure quoted is inclusive or exclusive

None of this is a trick. Suppliers quote the attachment alone because the rest depends on a carrier they have not seen. It becomes a problem only when a buyer compares one supplier’s attachment-only figure against another’s fitted and commissioned figure and concludes the first is cheaper.

Why the cheapest quote is often the most expensive attachment

Purchase price is paid once. Wear parts are paid every year the machine works, and on a high-duty head they can approach or exceed the purchase price over an ownership period. A cheaper attachment with proprietary tooling at a high unit price, or a tooth pattern that consumes more teeth per hour in Australian hardwood, will overtake a dearer machine faster than most buyers expect. Price the consumables before you sign, using wear parts to price before buying, and ask for a cost per hour rather than a cost per part.

Parts lead time is the second half of the same argument. An attachment standing idle because a bearing is coming by sea costs you the carrier’s hourly rate, the operator’s wages and possibly the job, none of which appears in the purchase comparison. The question is not only what the part costs but where it is held and how fast it arrives, which matters more the further you are from the supplier.

Third is production. An attachment that clears a given area faster earns the carrier’s hour back sooner, and in total cost of ownership the carrier cost dominates the attachment cost by a wide margin. A slower attachment bought for less is usually the more expensive decision.

How to ask for a price you can actually compare

Send every supplier the same information and ask for the answer in the same shape. The request for quote template has the full list, and you can send it through request a quote. At minimum, give the carrier’s make, model, year, weight, hitch type, auxiliary circuits, measured flow and pressure, and case drain status; describe the material and site honestly, including species, diameter range and abrasive ground; and state the delivery address.

Then ask for the response in a fixed form: a delivered and installed price in that configuration, a list of what is included, a separate price for each option, the wear-part list with prices and expected life in hours, the freight cost to your address, and the availability of parts. Quotes returned in that shape can be laid side by side. Quotes returned as one number cannot.

Turning a price into the number that matters

Price is an input, not an answer. The number that decides a purchase and wins a tender is the cost per stem, stump, hectare or hole, built from the delivered cost, the finance, the wear parts, the carrier and the production rate together. The cost-per-unit calculator does the arithmetic, and building a tender rate shows how it flows into a price to a client.

The mechanism is easiest to see in round hypothetical figures, which are illustrative only and are not prices for any product. Assume attachment A is quoted at $40,000 delivered and installed and B at $50,000, and that finance and depreciation make A $10,000 a year in fixed cost and B $12,500. Assume A consumes $25 an hour in wear parts and B $18, that the carrier, fuel and operator cost $180 an hour in both cases, and that both work 500 productive hours a year. A then costs $112,500 a year and B $111,500. The dearer attachment is already marginally cheaper to run before production is counted, and if B clears 10 per cent more in an hour it is roughly 10 per cent cheaper again per unit of work.

Run the same arithmetic with your own figures and the answer may go the other way. The point is that the comparison is decided by hours and units, not by the front page of the quote.

The used market and what condition does to value

A used attachment is often the right commercial answer, particularly for a contractor testing whether a category belongs in the fleet at all. Value in the second-hand market is set less by age than by four things: whether the brand has an Australian parts pathway, whether the structure and pivots are sound, whether the tooling and its holders are serviceable, and whether the machine comes with a bracket that suits a common hitch. A worn tooling set alone can represent a substantial share of a low asking price, which is why inspecting used forestry attachments treats wear parts as part of the purchase price. The logic works in reverse too: a well-documented attachment from a supported brand resells for more, so residual value belongs in the buying decision.

When hire answers the question instead

If you are searching for a price because you have one job in front of you, purchase price may be the wrong question. Hire, or dry hire of a carrier already fitted with the head, removes the compatibility risk and the residual value risk together, and gives you measured production figures on your own material before you commit capital. Hire versus buy sets out how to find the number of paid days a year at which the answer flips.

Frequently asked questions

Why will nobody publish a price for a forestry mulcher?

Because the price depends on the carrier, hitch, circuits, options and delivery address, and because exchange rates and freight move. A published figure would be wrong for most readers in most configurations, so suppliers quote against a specification instead.

What is a fair way to compare two quotes?

Put both into the same form: delivered and installed in your configuration, options priced separately, wear parts listed with expected life in hours, and freight shown as its own line. Then convert both to a cost per unit of work using your own hours and production estimates.

Is the cheapest quote ever the right one?

Sometimes, but only after consumables, parts availability and production rate have been compared. A lower purchase price with dearer tooling, slower output or a long parts lead time is usually the more expensive choice over a few thousand hours.

Should I budget for anything beyond the quoted price?

Yes. Allow for carrier-side hydraulic and electrical work, a bracket to suit your hitch, commissioning, a stand, an initial spares kit and freight, and ask each supplier which of those their figure already covers.

Does buying used save money?

It can, provided the tooling, structure, pivots and parts pathway are checked before purchase. Treat the cost of restoring worn tooling as part of the purchase price, because it is usually payable immediately.

Get a recommendation, not just a price

Send us your excavator model, hydraulic figures, tree species and typical diameters. We will come back with a carrier-matched configuration and a written specification you can compare against any other quote.