Shearex · Forestry mulchers

Shearex HM-70SV front-mount mulcher

The 125 hp front-mount head: 190 cm cutting width with a 25 cm target diameter and 178 to 288 L/min of continuous flow for dedicated mulching carriers.

Prepared by Forestry Machines Australia editorial teamSource-reviewed by Forestry Machines Australia source review

Published Last reviewed

Specifications can change. Confirm the current data sheet and quotation before ordering. How we research and review.

Best suited to

  • Dedicated mulching carriers
  • Transmission easements
  • Pipeline corridors
  • Large property clearing

Published specifications

SpecificationValue
Carrier typeFront-mount (skid steer, compact track loader or dedicated carrier)
Minimum carrier power125 hp
Cutting width190 cm
Optimal target material diameter25 cm
Attachment weight1,655 kg
Continuous hydraulic flow178–288 L/min
ToolingCarbide teeth or blades

Figures are taken from manufacturer and Australian distributor material and can change. Confirm against the current data sheet and quotation.

Typical mulcher at work in Australian conditions
Illustrative mulcher application—not a photograph of the HM-70SV.

The line between an attachment and a machine

Somewhere in the Shearex HM front-mount mulcher range the product stops being something a contractor hangs on a loader they already own and becomes something they buy a machine for. The HM-70SV is that crossing. It keeps the 190 cm cutting width of the HM-70 and changes almost everything else: 125 hp minimum carrier power instead of 74, a 25 cm published target diameter instead of 20, 178 to 288 L/min of continuous flow instead of 133 to 204, and 1,655 kg of head instead of 1,361.

Nothing about that list says wider. It says heavier duty on the same footprint, which is a specific and useful thing to buy. Narrow corridors do not get easier to work by fitting a broader rotor, and a transmission easement or pipeline strip with material at the top of the loader range is exactly the job where a 190 cm head on a purpose-built carrier beats both a wider head and a lighter one. Above it, the HM-88LV spends the same hydraulics on 220 cm of width instead.

What changes when the carrier is purpose-built

Three assumptions that hold for loader attachments stop holding here.

The first is that the head is chosen and the carrier is whatever is in the yard. At 1,655 kg this head is beyond what a conventional skid steer should carry on the front, and only the largest compact track loaders come into the conversation at all, with the manufacturer’s blessing and at the edge of their front-end stability. The skid steer and track loader class page explains where that limit falls.

The second is that hydraulics are a compatibility check. On a dedicated carrier they are a specification: the machine is ordered with the circuit the head needs rather than assessed against it. The circuit questions themselves are laid out on the HM-60 page, and they apply here at larger numbers.

The third is that the motor is the manufacturer’s business. It is not, and that is the most useful thing on this page.

Motor build is a specification, not a detail

A mulcher motor has to be matched to the flow and pressure the carrier actually supplies. Build the head for more flow than the machine delivers and the rotor turns slower than intended in the material it was bought for, which shows up as poor bite and long passes rather than as an obvious fault. Build it for less and the circuit dumps the excess over relief as heat. Neither error announces itself on the first day.

So ask, in writing, which motor displacement the head will be supplied with, and against which measured carrier figures that choice was made. The published 125 hp minimum is a floor, not a working point: as an illustration only, 178 L/min at an assumed 300 bar is about 89 kW, roughly 119 hp of hydraulic power at the bottom of the flow window, before travel, cooling and driveline losses. The method behind that sum is set out on the VM-50SR page; run your own numbers through the hydraulic power calculator. See hydraulic matching and, because a carrier working heavy material holds the rotor near relief for long stretches, hydraulic cooling and heat.

Get the motor decision documented

Ask the supplier to state the motor build and the carrier flow and pressure it was selected for on the order. If the head later underperforms, that single line is what turns a dispute into a diagnosis.

Heavier material on the same footprint

The published optimal target material diameter of 25 cm is what the extra mass and hydraulic appetite buy. It covers most regrowth eucalypt, wattle and pine understorey on maintained easements, and it is the figure a rate should be built on rather than the occasional larger stem worked from the top down; maximum diameter versus production diameter explains the difference. The useful comparison inside the family is with the VM-50SR, the excavator head with the same 25 cm target: same material, opposite architectures, and the ground decides which one earns.

Narrow corridors with heavy material

The contracts that suit it are powerline and transmission easements, mining and pipeline corridors and firebreak construction inside bushfire fuel reduction programs, where the strip is defined and the material is heavier than a loader head should be asked to take. Corridor ground has usually been disturbed already, so buried debris, spoil and rock in cuttings are routine and most operators commit to carbide, leaving blades for clean green material where ground contact is rare; blades versus carbide teeth compares the two.

Where it hands over

Ground the carrier cannot traverse belongs to an excavator head: batters, table drains, steep sidling and wet corridors, as excavator mulcher versus skid steer mulcher sets out. Step down to the HM-70 if the carrier is a conventional loader and material stays under 20 cm. Step across to the HM-88LV when the job is measured in hectares on open ground and the same hydraulics can be spent on width instead. Step up to the HM-90SV when 40 cm material is routine rather than occasional.

Consumables at a heavier duty cycle

Heavier material consumes tooling faster, and the honest way to see that is cost per hectare rather than cost per set, because a set replaced twice as often on hard ground looks identical on a price list and very different on a job. Get Australian stock positions and pricing from Machinery Specialist before signing, using the list in wear parts to price before buying. Fines loading on the carrier’s screens is a daily matter on any front-mount head, and on a machine working at sustained pressure it is also what decides whether the afternoon is as productive as the morning.

There is a single HM-70SV variant, so the remaining quotation decisions are tooling, the motor build discussed above, the case drain and return arrangement, and the electrical control on the carrier’s harness. Confirm the quoted mass is for the head as ordered with its mounting plate.

What a dedicated carrier costs you in flexibility

Moving from a loader attachment to a purpose-built carrier attachment buys duty cycle and gives up optionality, and that trade deserves to be made deliberately rather than discovered later.

A skid steer or compact track loader between mulching jobs runs a bucket, a grapple, a four-in-one or a broom, and earns on sites that have nothing to do with vegetation. A dedicated mulching carrier does one thing. Its utilisation depends entirely on the vegetation pipeline, its resale market is narrower, and its operator is generally a specialist rather than anyone on the crew. In exchange it holds the rotor at pressure all day in material that would stop a loader, and it does so without living at the edge of its front-end capacity.

The test is contract continuity rather than contract size. A business with twelve months of corridor and easement work booked or reasonably foreseeable should make the move. A business with one large contract and a hopeful pipeline should price the same work with a hired carrier first, as hire versus buy sets out, and see what the hours actually turn out to be.

Narrow corridors have their own logistics

The reason to choose 190 cm over a wider head is usually the corridor itself, and corridor work brings constraints that never appear on a production sheet.

Access is frequently along the corridor rather than to it, which means the machine travels the ground it is about to treat and cannot easily be repositioned around an obstacle. Rail corridors add possession windows that cannot be extended and protocols that govern every movement near the track. Transmission easements add the asset owner’s approach distances, permits and isolation arrangements, all of which belong to them and should be settled before mobilisation. Pipeline corridors add marker posts, valve stations and depth-of-cover constraints that determine where a machine of this mass can travel at all.

Each of those turns time into a fixed cost rather than a variable one, which is the real argument for a head that fits the strip and works heavy material at speed: the window is fixed, so production inside it is the only variable left.

Commissioning and the first hundred hours

The value of documenting the motor build shows up in commissioning. With the head fitted, measure flow and pressure at the coupler rather than at the pump, run under full load with oil temperature logged, and compare the rotor speed reached in material against what the build was specified for. Check belt tension after the first shift and again after the first week, and torque the tooling holders after the first few hours.

Then set a review at around a hundred hours against the rate the work was priced on. On a purpose-built carrier that review is the moment to catch a mismatch between the motor build and the circuit, because the symptom of a mismatch is a machine that works acceptably but never quite reaches the numbers, and that is a problem which gets normalised if nobody looks for it early.

Exclusion zones and thrown material in a defined strip

A head working 25 cm material in a narrow corridor throws mulch into ground the crew is likely to be standing on or driving along, and the corridor’s own assets are usually the nearest things to hit. Exclusion zones should account for thrown material as well as the machine’s working envelope, spotters and traffic arrangements belong in the method statement, and crews should be working to applicable WHS procedures and the manufacturer’s instructions. Where the corridor carries live services, the asset owner’s requirements govern.

Confirm before ordering

  • Motor build stated on the order, with the carrier flow and pressure it was selected against
  • Carrier meets 125 hp and its circuit holds 178 to 288 L/min continuously at pressure
  • Case drain and return arrangement specified with the carrier, not adapted afterwards
  • 1,655 kg checked against the carrier's capacity and, if a track loader is proposed, its front-end stability
  • Cooling capacity and screen access for sustained work near relief
  • Corridor width and access confirmed, since this head is chosen for duty rather than swath
  • Tooling costed per hectare for disturbed corridor ground
  • Delivered price including mounting plate, hoses and electrical harness

Frequently asked questions

Can a large compact track loader run the HM-70SV?

Only the largest high-flow machines come close, and 1,655 kg puts them at the edge of their front-end capacity. It is designed for dedicated carriers, so the specific machine has to be cleared with the distributor.

What does it offer over the HM-70, given the same width?

A 25 cm target diameter instead of 20 cm, a larger flow window and a heavier build. You are buying duty cycle, not swath, which is the right trade on narrow corridors with heavy material.

Why does the motor build matter so much on this head?

Because a motor matched to flow the carrier cannot supply simply turns the rotor slower in the timber the head was bought for, and the symptom looks like poor performance rather than a specification error.

Is 125 hp enough?

It is the published floor. The illustrative sum above puts the bottom of the flow window near 119 hp of hydraulic power alone, so a carrier comfortably above the minimum will use more of the range.

Why is it heavier than the HM-70 at the same width?

1,655 kg against 1,361 kg is rotor and structure. That mass is what lets it take 25 cm material continuously, and it is also what puts it past a conventional loader.

Other forestry mulchers to compare

Compare models side by side with specification graphs →

VM

Shearex VM-25SK excavator mulcher

The compact excavator mulcher for 5 to 8 tonne carriers: 70 cm of cutting width where reach over drains and banks matters more than raw hectares.

70 cmCutting width
5–8 t excavatorCarrier
499 kgAttachment
VM

Shearex VM-35SK excavator mulcher

The 8 to 12 tonne crossover class: 95 cm of cutting width and a 15 cm target diameter on a carrier that still travels economically and carries other attachments.

95 cmCutting width
8–12 t excavatorCarrier
522 kgAttachment
VM

Shearex VM-40SL excavator mulcher

A genuine commercial land-clearing head for 12 to 15 tonne excavators: 107 cm cutting width and a 20 cm optimal target diameter.

107 cmCutting width
12–15 t excavatorCarrier
757 kgAttachment
VM

Shearex VM-50SR excavator mulcher

Where carrier hydraulics become the conversation: 159 to 238 L/min of continuous flow drives 123 cm of rotor and a 25 cm target diameter on 15 to 20 tonne excavators.

123 cmCutting width
15–20 t excavatorCarrier
975 kgAttachment
VM

Shearex VM-60SR excavator mulcher

The heavy-vegetation head for 20 to 25 tonne carriers: 149 cm cutting width and a 40 cm optimal target diameter, with a 130 hp minimum carrier power requirement.

149 cmCutting width
20–25 t excavatorCarrier
1,188 kgAttachment
VM

Shearex VM-65SV excavator mulcher

Industrial vegetation clearing equipment for 25 to 40 tonne excavators: 165 cm of cutting width, a 50 cm target diameter and up to 344 L/min of continuous flow demand.

165 cmCutting width
25–40 t excavatorCarrier
1,681 kgAttachment
HM

Shearex HM-60SR / HM-60DR front-mount mulcher

The entry front-mount Shearex for skid steers and compact track loaders from 68 hp: 149 cm of cutting width and a 15 cm target diameter in SR and heavier DR variants.

149 cmCutting width
68+ hp carrierCarrier
1,043 kgSR variant
HM

Shearex HM-70SR / HM-70DR front-mount mulcher

A 190 cm front-mount head from 74 hp carriers with a 20 cm optimal target diameter, available in SR and heavier DR variants for higher-flow loaders.

190 cmCutting width
74+ hp carrierCarrier
1,361 kgSR variant
HM

Shearex HM-88LV front-mount mulcher

A wider 220 cm production head for 140 hp and above carriers with a 25 cm target diameter, aimed at hectare-rate work on traversable ground.

220 cmCutting width
140+ hp carrierCarrier
1,760 kgAttachment
HM

Shearex HM-90SV front-mount mulcher

The heavy-vegetation front-mount head: 230 cm cutting width and a 40 cm optimal target diameter for 170 hp and above purpose-built carriers.

230 cmCutting width
170+ hp carrierCarrier
1,938 kgAttachment
HM

Shearex HM-100SV2 front-mount mulcher

An extreme 254 cm front-mount head with a 60 cm target diameter and dual-motor high-flow drive for 250 hp and above carriers. Not comparable with ordinary skid-steer forestry heads.

254 cmCutting width
250+ hp carrierCarrier
2,311 kgAttachment

Get a recommendation, not just a price

Send us your excavator model, hydraulic figures, tree species and typical diameters. We will come back with a carrier-matched configuration and a written specification you can compare against any other quote.